Archive for February, 2012

Watched this film last night and I was blown away! Meryl Streep is one of the best actresses of all time and she nailed it! Its one of the best films I have ever seen, Iv seen a lot of films and they are so predictable I just sit there and mong it the tele and nothing goes in. [...]

Recce sheet

Posted: February 2, 2012 in DP3, projected visuals, show & tell

Production title: Projected Visuals Producer: Charlie Wright Date of recce 02/02/12 Time of recce: 1.32 pm Location: Bingham Person in charge of location: Charlie Wright Contact number:07960322990 Power available: Power socket in hallway ( 2 feet away) Sound/Ambient noise/ problem: because the project is using its own soundtrack, sound isn’t a problem while filming.   [...]

Production Schedule

Posted: February 2, 2012 in DP3, projected visuals, show & tell

Shot Dates Monday 6th Tuesday 7th Wednesday 8th Equipment List Panasonic SD60 x 2 – two is needed to capture the ink hitting the water from different angles. Tripod x 2 Lighting kit ( 3 point lighting) Extension cable Matts Cast and crew are not needed for the production because I am shooting it on [...]